HOME
ABOUT
SERVICES
CASE STUDIES
CONTACT
More
​
Erection of a portal frame with low level steel framed floor. The building was on a flood plain all the
deliveries and installation had to be very carefully coordinated with the site team, despite this, the
erection was completed on time.