HOME
ABOUT
SERVICES
CASE STUDIES
CONTACT
More
DMG carried out the Installation of strengthening steel to three floors of an existing multi storey car park. We also erected a 200 tonne main frame structure on the car park, including the metal deck erected with a tower crane.